三年片在线观看大全国语,黄金app免费下载,混乱家庭派对,亚洲日韩一页精品发布,男Ji大巴进入女人的视频小说

冷再生施工和機(jī)械租賃業(yè)務(wù)
筑路架橋,奉獻(xiàn)社會;以人為本,不斷創(chuàng)新

服務(wù)熱線

18264104888

新聞中心

首頁>>新聞中心

遵循施工要求:改良土施工與冷再生機(jī)租賃配合

來源:http://www.vanfur.cn/ 日期:2025-07-10 發(fā)布人:

  改良土施工需嚴(yán)格遵循規(guī)范流程,從前期準(zhǔn)備到具體工藝實(shí)施,每一步都關(guān)乎工程質(zhì)量。而在這一過程中,冷再生機(jī)租賃服務(wù)為施工提供了重要的設(shè)備支持,助力改良土施工開展。

  The construction of improved soil requires strict adherence to standardized procedures, from preliminary preparation to specific process implementation, each step is related to the quality of the project. In this process, the leasing service of cold recycling machines provides important equipment support for construction, helping to improve the efficiency of soil construction.

  施工準(zhǔn)備階段是打好基礎(chǔ)的關(guān)鍵。施工前要對需改良的土料種類進(jìn)行核實(shí),路堤填料、改良土外摻料(石灰或水泥)的種類及技術(shù)條件必須符合設(shè)計(jì)要求。填筑前需對取土場的填料取樣檢驗(yàn),填筑時(shí)也要對運(yùn)現(xiàn)場的填料抽樣檢驗(yàn),若填料土質(zhì)變化或更換取土場,需重新檢驗(yàn)。

  The construction preparation stage is the key to laying a solid foundation. Before construction, it is necessary to verify the types of soil materials that need to be improved. The types and technical conditions of embankment filling materials and improved soil admixtures (lime or cement) must meet the design requirements. Before filling, it is necessary to sample and inspect the filling materials from the soil sampling site. During filling, the filling materials transported to the site should also be sampled and inspected. If the soil quality of the filling materials changes or the soil sampling site is replaced, re inspection is required.

  在路基開工前,要根據(jù)工程土類性質(zhì)、填料性質(zhì)和壓實(shí)機(jī)械條件,選擇不小于 100 米的試驗(yàn)區(qū)段進(jìn)行路基填筑試驗(yàn)。通過試驗(yàn)選定與路基填筑、壓實(shí)、檢測相關(guān)的工藝參數(shù)以及改良土配合比等,將試驗(yàn)資料整理上報(bào)監(jiān)理工程師批準(zhǔn)后,用于指導(dǎo)后續(xù)路基施工。

  Before the comprehensive construction of the roadbed, a test section of no less than 100 meters should be selected for roadbed filling testing based on the properties of the engineering soil, filling materials, and compaction machinery conditions. By conducting experiments, process parameters related to roadbed filling, compaction, and testing, as well as the mix proportion of improved soil, are selected. The test data is then compiled and submitted to the supervising engineer for approval, and used to guide subsequent roadbed construction.

  改良土的配合比確定也不容忽視?;惨韵侣返瘫倔w及基床底層采用改良土填筑,其中基床以下路堤本體的墊層為水泥改良土,路堤本體不浸水路堤為石灰改良土,浸水路堤為水泥改良土,基床底層為厚度 2.3 米的水泥改良土。具體配合比需根據(jù)設(shè)計(jì)要求和取土場土料的塑性指數(shù)及液限、塑限等指標(biāo),通過試驗(yàn)室試驗(yàn)確定。

  The determination of the mix proportion for improved soil cannot be ignored. The embankment body below the subgrade and the bottom layer of the subgrade are filled with improved soil. The cushion layer of the embankment body below the subgrade is made of cement improved soil, the non immersed embankment is made of lime improved soil, the immersed embankment is made of cement improved soil, and the bottom layer of the subgrade is made of cement improved soil with a thickness of 2.3 meters. The specific mix proportion needs to be determined through laboratory tests based on design requirements and the plasticity index, liquid limit, plastic limit, and other indicators of the soil material in the borrow area.

  施工工藝的規(guī)范實(shí)施是保證改良土質(zhì)量的核心。要驗(yàn)收下承層,填筑前檢查基底幾何尺寸,核對壓實(shí)標(biāo)準(zhǔn),對不符合標(biāo)準(zhǔn)的基底進(jìn)行處理,直達(dá)到驗(yàn)收標(biāo)準(zhǔn)。

  The standardized implementation of construction technology is the core of ensuring the quality of improved soil. Firstly, it is necessary to inspect the underlying layer, check the geometric dimensions of the foundation before filling, verify the compaction standards, and handle any foundation that does not meet the standards until it meets the acceptance criteria.

26

  測量放樣環(huán)節(jié),需在施工現(xiàn)場附近引臨時(shí)水準(zhǔn)點(diǎn)并報(bào)監(jiān)理審批,作業(yè)時(shí)嚴(yán)格控制標(biāo)高,在路基上采用方格網(wǎng)控制填料量,方格網(wǎng)縱向樁距不宜大于 10 米,橫向在路基兩側(cè)及中心設(shè)方格網(wǎng)樁。

  In the measurement and layout process, temporary benchmark points need to be set up near the construction site and reported to the supervisor for approval. During the operation, the elevation should be strictly controlled, and a grid should be used to control the filling amount on the roadbed. The longitudinal distance between grid piles should not exceed 10 meters, and grid piles should be set horizontally on both sides and the center of the roadbed.

  拌和過程中,改良土混合料采用穩(wěn)定土拌和設(shè)備在拌和廠集中拌和,同時(shí)配備碎土設(shè)備土塊,確保拌和均勻,混合料中不含有大于 10 毫米的土塊和未消解石灰顆粒,且組成和含水率符合規(guī)定要求,必要時(shí)根據(jù)天氣情況調(diào)整拌和時(shí)的含水率與碾壓時(shí)含水率的關(guān)系。

  During the mixing process, the improved soil mixture is mixed using stable soil mixing equipment in the mixing plant, and soil crushing equipment is equipped to eliminate soil blocks to ensure uniform mixing. The mixture does not contain soil blocks larger than 10 millimeters or undigested lime particles, and its composition and moisture content meet the specified requirements. If necessary, the relationship between the moisture content during mixing and the optimal moisture content during compaction can be adjusted according to weather conditions.

  運(yùn)輸環(huán)節(jié)采用大噸位自卸車,拌合好的混合料要盡快運(yùn)到鋪筑現(xiàn)場,運(yùn)輸過程中進(jìn)行覆蓋以減少水分損失。

  The transportation process uses large tonnage dump trucks, and the mixed material should be transported to the paving site as soon as possible. During transportation, it should be covered to reduce moisture loss.

  攤鋪時(shí)根據(jù)松鋪厚度計(jì)算每車混合料的攤鋪面積,確定堆放密度,全斷面均勻攤鋪,避免縱向接縫,中途中斷超過 2 小時(shí)需設(shè)置橫向施工縫并采用搭接施工。整型按規(guī)定坡度和路拱進(jìn)行,尤其注意接縫處整平,整型過程中嚴(yán)禁車輛通行,初步整型后檢查松鋪厚度,必要時(shí)補(bǔ)料或減料。

  When paving, calculate the paving area of each truck of mixed material based on the thickness of the loose paving, determine the stacking density, and evenly spread the entire section to avoid longitudinal joints. If the interruption exceeds 2 hours, horizontal construction joints should be set up and lap construction should be used. The shaping process shall be carried out according to the prescribed slope and road arch, with special attention paid to leveling the joints. Vehicles are strictly prohibited from passing during the shaping process. After preliminary shaping, the thickness of the loose paving shall be checked, and if necessary, additional or reduced materials shall be added.

  碾壓環(huán)節(jié),當(dāng)混合料接近含水率時(shí),用重型壓路機(jī)在路基全寬內(nèi)碾壓要求的壓實(shí)密度,碾壓完成后表面無明顯輪跡。各區(qū)段交接處相互重疊壓實(shí),縱向搭接長度不小于 2.0 米,縱向行與行之間輪跡重疊不小于 40 厘米,上下兩層填筑接頭錯開不小于 3.0 米,兩作業(yè)區(qū)段銜接處縱向搭接拌和長度不小于 2.0 米。

  In the compaction process, when the mixture approaches the optimal moisture content, a heavy-duty roller is used to compact the entire width of the roadbed to the required compaction density. After compaction, there are no obvious wheel marks on the surface. At the junction of each section, they should overlap and compact with each other, with a longitudinal overlap length of not less than 2.0 meters. The overlap of wheel tracks between rows in the longitudinal direction should not be less than 40 centimeters. The joints of the upper and lower layers of filling should be staggered by not less than 3.0 meters, and the longitudinal overlap mixing length at the junction of the two operation sections should not be less than 2.0 meters.

  本文由冷再生機(jī)出租友情奉獻(xiàn).更多有關(guān)的知識請點(diǎn)擊:http://www.vanfur.cn真誠的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識我們將會陸續(xù)向大家奉獻(xiàn).敬請期待.

  This article is a friendly contribution from Cold Recycling Machine Rental For more information, please click: http://www.vanfur.cn Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

閱讀/ Recommended reading

  水泥撒布車作為路面基層施工的關(guān)鍵設(shè)備,憑借其精準(zhǔn)、的水泥撒布能力,在各類工程中發(fā)揮著不可替代的作用。其通過機(jī)械傳動控制撒布量,能均勻鋪設(shè)水泥等膠凝材料,大幅提升施工效率并...

冷再生機(jī)租賃有什么好處? 2025-07-28
冷再生機(jī)租賃全攻略:從設(shè)備到成本 2025-07-25
冷再生機(jī)的核心配置:適配路面再生的功能組合 2025-07-24
冷再生機(jī)租賃車結(jié)構(gòu)的組成解析 2025-07-23

產(chǎn)品/ Recommended products